How to add soil layers, how to add a soil layer profile

Notes:

  • A model can contain multiple soil layer profiles.
  • Soil layers can be applied under a beam or a plate.
  • Diamonds supports the input of soil layers according to a cone penetration test (CPT) and a Ménard test.
    This article demonstrates the input of a CPT.

  1. Select the beams/ plates under which you want to apply soil layers and click on .
  2. In the Y-direction, choose for Soil layers and click on .
  3. Then, click on and enter the general settings:
    • Choose between a CTP or Ménard test.
    • Enter the position of the water level below the original ground level. This position is used to determine if Diamonds should calculate the soil stresses using the wet or dry density of soil. Any water and/or soil pressures should be added as a load by the user!
    • Select if the bottom layer should be extended to infinity. This option is checked by default because it results in a conservative value for the settlement.
  4. Click on to add a new soil layer.
    Enter the layer thickness, the compressibility constant C, the recompressibility constant A, the overconsolidation ratio OCR, the drainage ratio CC, the specific mass of dry and humid soil starting from the initial ground level (thus the ground level before excavation).

    • Usually, the compressibility constant C is given in the report of the CPT-test.
    • The recompressibility constant A and the drainage ratio CC are important for taking an excavation into account. With their default values, they will NOT take the faviourable effect of an excavation into account (= conservative settlement). Read here on how to define these parameters so the excavation is taken into account.
    • The overconsolidation ratio OCR takes préloading, different from an excavation, into account. For example: an old building will be demolished before building a new one. Or a large pile of soil (above the ground level) will be removed before construction starts. The old building and the pile of soil are a preloading of the soil which cannot be considered as an excavation. You’ll need to increase the OCR-value for that.
  5. Add as many soil layers as necessary.
  6. Hit OK to close all the dialog.
  7. Click on  to run the elastic analysis. In the tab page soil